Look, we've been doing this long enough to know that every project's got its own quirks. What works for a waterfront condo tower won't fly for a century-old heritage conversion. That's why we've built our practice around flexibility and real-world problem-solving rather than cookie-cutter solutions.

Architectural Design
01

Architectural Design & Planning

This is where it all starts. We're talking initial sketches over coffee, zoning headaches, site analysis, and turning your "wouldn't it be cool if..." into actual buildable plans. Been working with Vancouver's bylaws for years now, so we know what'll pass and what won't.

Site Analysis
Concept Development
Permit Documentation
Construction Drawings

Timeline: 8-16 weeks depending on project complexity

Sustainable Building
02

Sustainable Building Solutions

Honestly, this isn't optional anymore - it's just smart design. We integrate passive heating, natural ventilation, recycled materials, and energy systems that'll actually cut your operating costs. Plus BC's climate is perfect for this stuff if you know what you're doing.

Energy Modeling

We run the numbers so you know exactly what your building'll cost to heat, cool, and operate before breaking ground.

Material Selection

Local suppliers, low-embodied carbon, durability that lasts. No greenwashing here.

Certification Support

LEED, Passive House, Built Green - we've navigated them all.

Timeline: Integrated throughout design phases, 2-4 weeks for energy analysis

Interior Space Design
03

Interior Space Optimization

Square footage costs money, so let's make every inch count. We're big on flow, natural light, and spaces that adapt to how you actually live or work. No dead corners or hallways that go nowhere.

  • Space Planning Function first, then we make it look good
  • Lighting Design Natural where possible, strategic artificial where needed
  • Material & Finish Selection Durable, beautiful, and actually available in Canada
  • Custom Built-ins Storage that fits your stuff, not someone else's idea of it

Timeline: 4-8 weeks, can overlap with architectural design

Heritage Restoration
04

Heritage Building Restoration

Vancouver's got some beautiful old bones, and tearing them down's usually a waste. We've gotten pretty good at respecting what was there while making buildings work for today. Sometimes that means hidden HVAC systems or sneaking accessibility features into century-old layouts.

Historical Research

Digging through archives to understand original intent and materials

Structural Assessment

What stays, what goes, what needs serious attention

Heritage Permits

Navigating city requirements and conservation guidelines

Adaptive Reuse

Making old spaces work for new functions

Timeline: 12-24 weeks, heavily dependent on heritage designation and condition

Project Management
05

Project Management & Consultation

Someone's gotta keep all the moving parts from colliding. We handle contractor coordination, budget tracking, and those inevitable on-site decisions that come up. Also great for clients who just need occasional guidance rather than full design services.

Contractor Selection & Bidding

We know who does quality work and who's gonna ghost you mid-project

Construction Administration

Site visits, RFI responses, making sure what's built matches what was drawn

Budget Management

Keeping costs in check and finding savings when needed

Schedule Coordination

Because your electrician can't rough-in before the framing's done

Timeline: Duration of construction phase, typically 6-18 months

3D Visualization
06

3D Visualization & Modeling

Not everyone can read floor plans (and that's totally fine). We create photorealistic renderings and virtual walkthroughs so you can see what you're actually getting. Also super helpful for city presentations and getting stakeholder buy-in.

Exterior Renderings

Street views, aerial perspectives, and seasonal lighting variations

Interior Renderings

Room-by-room visualization with accurate materials and lighting

Virtual Tours

Interactive walkthroughs that let you explore before construction

Construction Coordination Models

BIM models for clash detection and trade coordination

Timeline: 2-4 weeks for rendering packages, ongoing for BIM coordination

Our Typical Process (Though Every Project's Different)

Here's roughly how things unfold from that first phone call to final walk-through. Real life's messier than this, but it'll give you an idea.

1

Initial Consultation (Week 1)

We grab coffee (or jump on Zoom) and you tell us what's on your mind. Budget, timeline, must-haves, deal-breakers. We'll let you know if we're a good fit and what the realistic possibilities are. No charge for this chat.

2

Programming & Site Analysis (Weeks 2-3)

We visit the site, measure everything, check zoning, review surveys, and document existing conditions. Meanwhile, we're refining exactly what the building needs to do and how much space that requires. This is where reality meets ambition.

3

Schematic Design (Weeks 4-7)

Sketches, rough floor plans, basic 3D models. We're exploring different layouts and approaches, seeing what works with the site and budget. Usually present 2-3 options, then refine based on your feedback. This phase is all about big-picture decisions.

4

Design Development (Weeks 8-12)

Now we're getting specific. Materials, structural systems, mechanical approach, window details, you name it. The design's locked in conceptually, so we're figuring out how to actually build it. Consultants come on board for engineering input.

5

Construction Documents (Weeks 13-20)

The detailed stuff. Every wall dimension, every bolt size, every finish specification. These are the drawings contractors bid from and build from, so they gotta be thorough. We coordinate with engineers to make sure structure, mechanical, and electrical all play nice together.

6

Permitting (Weeks 21-28)

Submitting to the City of Vancouver and waiting. We handle revisions based on city comments, coordinate with plan checkers, and shepherd everything through. Timeline's honestly out of our control here - it's usually 6-8 weeks but can stretch longer.

7

Bidding & Negotiation (Weeks 29-32)

Getting contractor bids, reviewing proposals, clarifying scope questions. We help evaluate who's giving you the best value (not always the lowest number). Then contract negotiations and getting everyone signed up.